Handyman tips on installing a shower after shower is both luxurious and environmentally friendly at the same time, because it helps save water and is good for the environment. Due to the construction of most of the showers in these days, the shower in most small parts can be mounted. At the beginning of the installation of a shower is a basic understanding of plumbing and electrical installation and security is a prerequisite. There are five steps for installing a shower and you need a wizard to help you adjust the shower. The main steps lead to expanding water supply to power the shower, cover the supply of waste for the new shower room, mounting the plate on a shower or a custom frame assembly of windows and doors. Some basic requirements for the installation of a shower are also the shower head must be at least 1 5 meters below the water tank to flow of water sufficient for a descent. The shower also has its own water tank with cold water. The cables must be run under the floor or walls must be supported on the ground or in any other case, the lines on the walls by a series of collars to stop pressure surges caused by water pressure cons fittings in bulk. 1st steps The first step would be to the water where you want to feed the shower, this can be achieved by specific measures to expand. Tapping into the cold water reservoir and a connection to the power of the shower, hot water is then taken from an existing supply, cut into the pipe and insert a T-profile, make a new offer in the shower. If connections are made under the floor and make sure that all connections are tight, because if a leak under the floor of the point, it will go unnoticed until it is too late. 2. The installation of the shower tray: Place the shower tray, so that the case, the best way to fit a shower tray with a P-trap. Unscrew the trap on the shower and measure the distance between the bottom of the P-trap and the top of the shower tray more about 40mm at the bottom of the P-trap, where they will sit on the ground so that you have enough distance from the floor. The base is a frame or the shower tray made of sheets of wood to be treated rough. Screw together the edges of the image allows a removable panel for access to the case, then the whole body on the ground to ensure it is stable and rigid. With your help, lift the tray on the chassis shower. 3. The expansion of the waste supply: Use a hole in a fixed drill bit and cutting a hole through the wall of the same diameter as the drain in plastic. Attach the drain with the P-trap with snaps or the right connections. Slide the drain hose through the walls and fill holes or cracks around the pipe with a mixture of cement. They make connections to the outside wall or in an existing drain or leader of the hopper. 4. Door Installation: The holes for the metal frame of the shower door, use a spirit level to ensure that they are the same height. Screw all the pages supplied with parts. to ensure that you are a very tight cockpit sealing all sides and bottom of the shower. Arrange the interior of the shower. 5. Follows the same path of drilling the shower control thermostat on the wall near the pipe water supply, control thermostat, unplug all connections and test the shower
Electrical Tips-how to install a shower:cubicle|tray|Tiles|plumbing and waste
January 26th, 2010
admin
Posted in
Tags: 




